Eze Solutions Pty Ltd has a long list of project studies ranging from capital cost of $500k to $1.3 Billion that it has handled over 15 years of its existence. A partial list is as below:

Risk Management Plans

2010-Current

  • Pedestrian Level Crossings in NSW
  • Bridge Street Bridge, Lidcombe
  • Main North Line – Base Line Functional requirements
  • Sydney signal Box Power Supply Upgrading
  • Tunnel Evacuation Signage
  • Tunnel OHW Sectioning Switches
  • ESR PVC Cable Replacement
  • Auburn Junction Renewal
  • Meeks Rd. substation upgrade
  • Broadmeadow to Grafton microwave radio replacement
  • Hunter valley wayside detection
  • Wagga Wagga Bridge Renewal Project – Murrumbidgee River
  • Singleton Yard Upgrade with 2 way Running
  • Muswellbrook to Gulgong Ulan CTC
  • Quakers Hill – Riverstone Track Alignment
  • Balance of equipment purchase ($34 million) Geoff wooden
2005 to 2010

  • Ballast Cleaning Plant Replacement
  • Equipment Renewal of Resurfacing Consists
  • Harden to Wallendbeen – Replacement of NSW Standard Block Telegraph (Completed)
  • Equipment Renewal of Resurfacing Consists (Completed)
  •  Metro South Load Project (Upgrade 1500 volt supply to Granville – Liverpool Line)
  • Train Order Working Parks – Broken Hill, Bogan Gate – Tottenham
  • Marayong to Quakers Hill Rail Duplication
  • Moss Vale – Unanderra Concrete Resleepering Final Stage
  • Sefton Area Resignalling
  • Hurstville Substation Replacement
  • Sydenham and Meeks Road Junction Upgrading
  • Summer Hill Station, Easy Access Upgrade

Prior to 2005

  • WYE Remodelling
  • Well St Junction Remodelling
  • Replacement of Gas Cable
  • Moss Vale – Unanderra Concrete Resleepering
  • Easy Access Workshop for Station Upgrading Projects
  • Airport Line – Central Turnaround
  • Flemington Junction Upgrade
  • Macquarie River Underbridge
  • Waynet Stage 3 Project
  • Hawkesbury River Bridge
  • Overhead Wiring and Structures Upgrading Waverton to Waitara
  • Camberwell – Drayton Resignalling
  • Rail Telecommunications Technology Implementation Strategy
  • Supervisory Control and Data Acquisition (SCADA), Capital Cost $3.6M (Stage 1)
  • Islington, Sandgate and Belford Underbridges Renewal, Capital Cost $5M
  • Allandale Bridge, Capital Cost $2.3M
  • Railcom Communication Project
  • Flemington Junction Freight Priority Project, Capital Cost $30M
  • OHW for Hornsby Yard, Capital Cost $5M
  • Relocation from Transport House, Capital Cost $50M
  • Northern Area Hornsby to Gosford Section Hut – Substation Upgrade, Capital Cost $17.4M
  • North Fork Junction Renewal Project, Capital Cost $1M
  • Sydney Central Yard Upgrade, Capital Cost $22M
  • Electrical Works Wynyard Stage 2, Capital Cost $3.5M
Reference: JX-Feedback

Business Case

2010 – Current

  • A large number of Business Cases for Rolling Stock projects of RailCorp.
  • Project Development and Business Case preparation for Emergency Response Unit of RailCorp
Prior to 2010

  • Upgrade of Signal Power Supply from Strathfield to Hornsby
  • Pedestrian Level Crossings in NSW
  • City Underground Bundle: Asset Management Plan 1999-2000
  • Prepared Detailed Business Plan for Consulting
  • Prepared Detailed Business Plan for CRC
  • Feasibility Assessment: Hurstville to Strathfield RL – Bid for DOT/NSW
  • Business Case for RIC – Project Management Improvement Initiative (PMII) Project
  • Business Case Study for Harden to Wallendbeen – Replacement of NSW Standard Block
  • Business Case for Renewal of Wagga Wagga Bridge
Reference: JX-Feedback

Economic & Financial Evaluation (EFE)

2010 – Current

  • Low Voltage Traffic Signal Lights Project of RMS, NSW – Capital Cost estimated to be $250 million.
  • Strategic Enterprise Technology Programme of RailCorp (an ICT Programme)
  • Picton Station Easy Access and Interchange Upgrade
  • Several smaller evaluations to support Business Cases of Rolling Stock Projects of RailCorp
  • Control Centre at Central Station
  • Fencing at Mortdale Maintenance Centre
  • Upgrade of Signal Power Supply from Strathfield to Hornsby
  • Extension of Petersham training College
  • Refurbishment of Burwood Street Property of RailCorp
  • Pedestrian Level Crossings in NSW
2005 to 2010

  • Train Running Information Management System
  • I.T backup storage solution
  • Sefton Area Resignalling
  • Auburn Junction Renewal
  • Nepean Bridge Renewal
  • Ballast Cleaning Plant Replacement
  • City Underground Office Options
  • Wagga Wagga Bridge Renewal Project – Murrumbidgee River
  • Quakers Hill – Riverstone Track Alignment
  • Purchase of track maintenance equipment
  • Oak Flats Electrification Project
  • Equipment Renewal of Resurfacing Consists
  • Harden to Wallendbeen Resignalling – CBA
  • Rail Duplication Project Marayong – Quakers Hill
  • Moss Vale – Unanderra Concrete Re-sleepering Final Stage
  • Cost Benefit Analysis of Resourcing Options for Metro Resource Centre
  • Train Operations Management System (TOMS)
  • Wagga Wagga Bridge Renewal Project – Murrumbidgee River
  • Sydenham and Meeks Road Junction Upgrade
  • Station Upgrading Projects of SRA
  • Station Upgrading Projects of SRA (Common Report)
  • Electrical Bonding of Station Canopies
  • Station Upgrading Projects of SRA – A Comparative Analysis of Easy Access Projects
2000 to 2005

  • Wollongong Station Upgrade for Easy Access
  • OHW Renewal – Waverton to Waitara
  • Orange Train Control Centre
  • Project Paragon
  • N Strathfield – Hornsby 2kV – 11kV Upgrade
  • Wyee Infrastructure Upgrade
  • AK Car Upgrade
  • Summer Hill Station Upgrade for Easy Access
  • Allawah Station Upgrade for Easy Access
  • Katoomba Station Upgrade for Easy Access
  • Fairfield Station Upgrade for Easy Access
  • Development of Campsie Depot
  • Mortuary Siding Replacement of 33kV cables
  • Epping Thornleigh – Upgrading of track circuits
  • RSA Relocation from Transport House
  • Hornsby Junction OHW Modernisation
  • Upgrade Touchsreen Telephone Conference System
  • Telecommunications System Bundle
  • MetroNet/Country Net
  • Train Tracking System
  • Newcastle Area Resignalling
  • Country South and West Bundles
  • City Underground Line Sectors for year 1999-2000
  • Bathurst Macquarie River Underbridge
  • Auburn Junction Renewal
  • Automatic Train Protection – Dapto to Bomaderry
  • Emergency Phones – City Underground
  • Granville Area Power Supply Upgrade – 2kV to 11kV
  • Camberwell – Drayton Resignalling
  • Permanent OHW to Rail Connection – North Shore and Main North Lines
  • Upgrade Frame Relay Data Network
  • OHW Modernisation – Lidcombe to Granville Corridor
  • Inner West Corridor – Overhead Wiring Upgrading
  • Project Paragon
  • Telecom Projects
  • N. Strathfield to Hornsby Power Supply Upgrading
  • Overhead Wiring and Structures Upgrading Waverton to Waitara
  • Project Paragon (New Northern Network Control Centre, Broadmeadow)
  • Sydney Control Centre Rationalisation
 Prior to 2000

  • Moss Vale to Unanderra Link Upgrade, Capital Cost $23.5M
  • SCADA, Capital Cost $3.6M
  • Northern Area Hornsby to Gosford Section Hut – Substation Upgrade, Capital Cost $17.4M
  • Sydney Yard Upgrade, Capital Cost $34.2M
  • Bankstown Station Upgrading Project, Capital Cost $3.3M
  • Telecommunication Project, Capital Cost $3M
  • Lidcombe to Granville OHW Modernisation Project, Capital Cost $30M
  • Leumeah Station Footbridge, Capital Cost $12M.
  • Feeder Upgrade 2 to 11kv – Granville to Cabramatta, Capital Cost $0.76M
  • OHW – Rail Connection N. Line and W. Lines, Capital Cost $1.5M.
  • Mortuary Siding Cable Relocation, Capital cost $1.3M
  • IT Acquisition by RSA
  • Parramatta Station Upgrade, Capital Cost $17M
  • Bombo Quarry Acquisition, Capital Cost $2.3M
  • Replacement of CBD 33 kV Cable, Capital Cost $9.95M
  • Kogarah Station Upgrade, Capital Cost $0.8M
  • Emergency Telephone System for City Underground, Capital Cost $3.35M.
  • Whittingham Junction Loop Extension Project, Capital Cost $1.5M

Value Management Studies

2010 – Current

  • “My time My Pay” project of RailCorp NSW
  • Ballast Cleaning Plant Replacement
  • Upgrade of Sydney Harbour Bridge
  • My Time My Pay Project of RailCorp
  • Transformation of RailCorp’s Survey technology from ISG to MGA
  • Retrofit/Replacement of 11kV South Wales Oil Circuit Breakers
  • Replacement of 33kV Outdoor Oil Circuit Breakers with SF6/Vacuum Breakers.
  • Musswell Brook Yard Upgrade– Worley Parsons
  • Upgrade Kerr’s Road Bridge- RailCorp
  • Baseline Functional Requirements for Main North Line – RailCorp
  • Replacement of Half Timber Blocks on ESR – RailCorp
  • Upgrading of Underbridge at Bridge Street Lidcombe – RailCorp
2005 to 2010

  • Pedestrian Level Crossings in NSW
  • Bridge Street Bridge, Lidcombe
  • Sydney signal Box Power Supply Upgrading
  • Tunnel Evacuation Signage
  • Tunnel OHW Sectioning Switches
  • ESR PVC Cable Replacement
  • Relocation of Newcastle Office (postponed)
  • Auburn Junction Renewal
  • Meeks Rd. substation upgrade
  • Broadmeadow to Grafton microwave radio replacement
  • Hunter valley wayside detection
  • Wagga Wagga Bridge Renewal Project – Murrumbidgee River
  • Singleton Yard Upgrade with 2 way Running
  • Muswellbrook to Gulgong Ulane CTC
  • Quakers Hill – Riverstone Track Alignment
  • Balance of equipment purchase ($34 million) Geoff wooden
  • Ballast Cleaning Plant Replacement
  • Equipment Renewal of Resurfacing Consists
  • Harden to Wallendbeen – Replacement of NSW Standard Block Telegraph (Completed)
  • Equipment Renewal of Resurfacing Consists (Completed)
  • Metro South Load Project (Upgrade 1500 volt supply to Granville – Liverpool Line)
  • Train Order Working Parkes – Broken Hill, Bogan Gate – Tottenham
  • Marayong to Quakers Hill Rail Duplication
  • Moss Vale – Unanderra Concrete Resleepering Final Stage
  • Sefton Area Resignalling
  • Hurstville Substation Replacement
  • Sydenham and Meeks Road Junction Upgrading
  • Summer Hill Station, Easy Access Upgrade
  • WYE Remodelling
  • Well St Junction Remodelling
  • Replacement of Gas Cable
  • Moss Vale – Unanderra Concrete Resleepering Stage 1
  • Easy Access Workshop for Station Upgrading Projects
  • Airport Line – Central Turnaround
  • Flemington Junction Upgrade
  • Macquarie River Underbridge
  • Waynet Stage 3 Project
  • Hawkesbury River Bridge
  • Overhead Wiring and Structures Upgrading Waverton to Waitara
  • Camberwell – Drayton Resignalling
  • Rail Telecommunications Technology Implementation Strategy
Prior to 2005

  • Supervisory Control and Data Acquisition (SCADA), Capital Cost $3.6M (Stage 1)
  • Islington, Sandgate and Belford Underbridges Renewal, Cap Cost $5M
  • Allandale Bridge, Capital Cost $2.3M
  • RailCom Communication Project
  • Flemington Junction Freight Priority Project, Capital Cost $30M
  • OHW for Hornsby Yard, Capital Cost $5M
  • Relocation from Transport House, Capital Cost $50M
  • Northern Area Hornsby to Gosford Section Hut – Substation Upgrade, Capital Cost $17.4M
  • North Fork Junction Renewal Project, Capital Cost $1M
  • Sydney Central Yard Upgrade, Capital Cost $22M
  • Electrical Works Wynyard Stage 2, Capital Cost $3.5M
Reference: JX-Feedback

Gateway Reviews

Recently completed:

  •  A Gate 5 Review for a $500 million Victorian Government project (South Moorang Rail Extension Project), assessing how far the project met its objectives and further actions required. Reviewed the Economical Evaluation Study prepared to justify the project, and the Risk Management Plan used to deliver the Project. Reported to the Victorian Government Treasurer.
  • Gate 3 Review: Investment Decision review for the New Zealand Transport Agency Transmission Gully, PPP Road project.

Post Completion Reviews

  • Automatic Dry-Break Fuelling Equipment Project
  • Construction of One-Spot Wagon Maintenance Centre at Port Waratah
  • Pennant Hills Station Upgrade Project
  • Goobang Junction Stage 2 Resignalling Project
  • Tempe – Cooks River Underbridge
  • Punchbowl Maintenance Centre Upgrade – Brake Road 3 and 5 Project
  • Central Flyovers Track Reconditioning Project
  • OHWM Illawarra Junction – Meeks Road Project
  • Town Hall Concourse Retiling
  • Dial-up Radio Telephone System Project
  • Wagga Wagga Station Upgrading Project
  • Wallendbeen – Cootamundra North Resignalling Project
  • Freight Rail’s Purchase of Re-spleepering Machines Project
  • Aylmerton Tunnel Reconditioning Project
  • Gosford Station Upgrade
  • Freight Rail’s Purchase of Two Continuous Action Tamping Machines
  • Junction Renewal: North Strathfield Stages 1, 2 & 3
  • CityRail: Stage 2 Cable Renewal Mt Victoria – Lithgow
  • Liverpool Yard Modernisation Project
  • Penrith 20 Span Viaduct 58.45km Project
  • Allawah Station Refurbishment Project
  • Dubbo 462.773km Bridge Renewal Project
  • Westmead Station Upgrade Project
  • CityRail’s Concord West Station Upgrade Project
  • Mt Thorley Track Upgrade Project: Concrete Re-sleepering and Re-railing
  • Epping Station: Platform Reconstruction – Feb. 1997
  • Procurement of 31 New CAD Workstations by RSA – Aug. 1999
  • Stage 1 Commissioning Blacktown Area Resignalling – Feb. 2000

Safety Management Plans (SMPs)

  • 11kV Cable Diversion of Goulburn Street Viaduct
  • 33kV Feeder No 746 Between Argyle Substation and PA Substation
  • Establishment of a Section Hut at Minto
  • Northern Substation and Section Hut Upgrade
  • Overhead Wiring Structure Replacement between Redfern and Goulburn Street
  • Rebuild Boiler Shop Substation Chullora
  • Lidcombe – Granville, Renewal of OHW
  • Moss Vale Geotech Rect.
  • Rockdale Station Rail Development

Environmental Management Studies

  • REF: Lidcombe – Granville OHW Modernisation Project
  • EMP: Lidcombe – Granville, Renewal of OHW
  • Site EMP: Lidcombe – Granville, Renewal of OHW
  • Newee Creek EIS Bid
  • REF: Westmead – Blacktown OHW Modernisation
  • REF: Metro West Signalling Safety Project Trainstops and Catchpoints

Training Courses

  • A series of One Day Familiarisation Course On: Risk Management of Capital Works and MPM Projects
  • A series of One Day Familiarisation Course On: Economic and Financial Evaluation of Capital Works and MPM Projects
  • Strengthen Management Developing and Training Institute in Ghana – a UNDP Project

Interface Management

  • Brisbane Airport Rail Link: Interface Management Plan

Monitoring and Evaluation

  • Monitoring and Evaluation System Design and Implementation in Nigeria for US$3 billion agricultural and rural development projects funded by World Bank.
  • Monitoring and Evaluation System Design and Implementation in Papua New Guinea for agricultural and rural development projects funded by ADB/AusAid.
  • A World Bank assignment as an Adviser in Fiji to the Telecommunication Authority of Fiji (TAF) on Monitoring and Evaluation System Design and Implementation. Working with the Chairman as counterpart, to monitor and evaluate impact of sectoral reforms. Also to assess how far TAF is meeting the objectives for which they were set up and the way forward.
  • Developed and implemented Monitoring and Evaluation system for a large organisation dealing in agricultural input distribution, procurement and having agro processing industries in India. This Corporation employed 6000 employees and had a business turnover of about USD 1 Billion.

Reference: Tevita-Feedback

Other Services

Services provided to Projects in ICT Sector

  • Telecommunication Authority of Fiji (TAF): Numbering Plan
  • Telecommunication Authority of Fiji (TAF): Spectrum Survey
  • Telecommunication Authority of Fiji (TAF): Regulatory Impact Assessment
  • Telecommunication Consultants India Ltd: Managed alliance with a Firm in Abu Dhabi
Services provided to Projects in Mining Sector
  • Hindustan Zinc Ltd: Set up a PERT Based system for Physical Progress Monitoring as well as keeping track of costs against budget
Banking
  • Introducing Risk Management System and Training Staff in Risk Management at KHAN BANK Mongolia as an ADB Consultant.
Regulatory Impact Assessment
  • Parliament of NSW – Examining Regulatory Impact Statement (RIS) and tabling reports in Parliament
  • Parliament of NSW – Cost Benefit Analysis Report on Subordinate Legislation Act
  • TAF Fiji- Regulatory impact assessment of reforms brought about in ICT Sector

Reference: Tevita-Feedback
Shivnesh-Feedback
Cruickshank
Rhonda-Feedback
PAC