Risk Management Plans

2010-Current

  • Pedestrian Level Crossings in NSW
  • Bridge Street Bridge, Lidcombe
  • Main North Line – Base Line Functional requirements
  • Sydney signal Box Power Supply Upgrading
  • Tunnel Evacuation Signage
  • Tunnel OHW Sectioning Switches
  • ESR PVC Cable Replacement
  • Auburn Junction Renewal
  • Meeks Rd. substation upgrade
  • Broadmeadow to Grafton microwave radio replacement
  • Hunter valley wayside detection
  • Wagga Wagga Bridge Renewal Project – Murrumbidgee River
  • Singleton Yard Upgrade with 2 way Running
  • Muswellbrook to Gulgong Ulan CTC
  • Quakers Hill – Riverstone Track Alignment
  • Balance of equipment purchase ($34 million) Geoff wooden

2002-2010

  • Ballast Cleaning Plant Replacement
  • Equipment Renewal of Resurfacing Consists
  • Harden to Wallendbeen – Replacement of NSW Standard Block Telegraph (Completed)
  • Equipment Renewal of Resurfacing Consists (Completed)

1996-2001

  • Metro South Load Project (Upgrade 1500 volt supply to Granville – Liverpool Line)
  • Train Order Working Parks – Broken Hill, Bogan Gate – Tottenham
  • Marayong to Quakers Hill Rail Duplication
  • Moss Vale – Unanderra Concrete Resleepering Final Stage
  • Sefton Area Resignalling
  • Hurstville Substation Replacement
  • Sydenham and Meeks Road Junction Upgrading
  • Summer Hill Station, Easy Access Upgrade
  • WYE Remodelling
  • Well St Junction Remodelling
  • Replacement of Gas Cable
  • Moss Vale – Unanderra Concrete Resleepering Stage 1
  • Easy Access Workshop for Station Upgrading Projects
  • Airport Line – Central Turnaround
  • Flemington Junction Upgrade
  • Macquarie River Underbridge
  • Waynet Stage 3 Project
  • Hawkesbury River Bridge
  • Overhead Wiring and Structures Upgrading Waverton to Waitara
  • Camberwell – Drayton Resignalling
  • Rail Telecommunications Technology Implementation Strategy
  • Supervisory Control and Data Acquisition (SCADA), Capital Cost $3.6M (Stage 1)
  • Islington, Sandgate and Belford Underbridges Renewal, Capital Cost $5M
  • Allandale Bridge, Capital Cost $2.3M
  • Railcom Communication Project
  • Flemington Junction Freight Priority Project, Capital Cost $30M
  • OHW for Hornsby Yard, Capital Cost $5M
  • Relocation from Transport House, Capital Cost $50M
  • Northern Area Hornsby to Gosford Section Hut – Substation Upgrade, Capital Cost $17.4M
  • North Fork Junction Renewal Project, Capital Cost $1M
  • Sydney Central Yard Upgrade, Capital Cost $22M
  • Electrical Works Wynyard Stage 2, Capital Cost $3.5M

Comments are closed.