2010-Current
- Pedestrian Level Crossings in NSW
- Bridge Street Bridge, Lidcombe
- Main North Line – Base Line Functional requirements
- Sydney signal Box Power Supply Upgrading
- Tunnel Evacuation Signage
- Tunnel OHW Sectioning Switches
- ESR PVC Cable Replacement
- Auburn Junction Renewal
- Meeks Rd. substation upgrade
- Broadmeadow to Grafton microwave radio replacement
- Hunter valley wayside detection
- Wagga Wagga Bridge Renewal Project – Murrumbidgee River
- Singleton Yard Upgrade with 2 way Running
- Muswellbrook to Gulgong Ulan CTC
- Quakers Hill – Riverstone Track Alignment
- Balance of equipment purchase ($34 million) Geoff wooden
2002-2010
- Ballast Cleaning Plant Replacement
- Equipment Renewal of Resurfacing Consists
- Harden to Wallendbeen – Replacement of NSW Standard Block Telegraph (Completed)
- Equipment Renewal of Resurfacing Consists (Completed)
1996-2001
- Metro South Load Project (Upgrade 1500 volt supply to Granville – Liverpool Line)
- Train Order Working Parks – Broken Hill, Bogan Gate – Tottenham
- Marayong to Quakers Hill Rail Duplication
- Moss Vale – Unanderra Concrete Resleepering Final Stage
- Sefton Area Resignalling
- Hurstville Substation Replacement
- Sydenham and Meeks Road Junction Upgrading
- Summer Hill Station, Easy Access Upgrade
- WYE Remodelling
- Well St Junction Remodelling
- Replacement of Gas Cable
- Moss Vale – Unanderra Concrete Resleepering Stage 1
- Easy Access Workshop for Station Upgrading Projects
- Airport Line – Central Turnaround
- Flemington Junction Upgrade
- Macquarie River Underbridge
- Waynet Stage 3 Project
- Hawkesbury River Bridge
- Overhead Wiring and Structures Upgrading Waverton to Waitara
- Camberwell – Drayton Resignalling
- Rail Telecommunications Technology Implementation Strategy
- Supervisory Control and Data Acquisition (SCADA), Capital Cost $3.6M (Stage 1)
- Islington, Sandgate and Belford Underbridges Renewal, Capital Cost $5M
- Allandale Bridge, Capital Cost $2.3M
- Railcom Communication Project
- Flemington Junction Freight Priority Project, Capital Cost $30M
- OHW for Hornsby Yard, Capital Cost $5M
- Relocation from Transport House, Capital Cost $50M
- Northern Area Hornsby to Gosford Section Hut – Substation Upgrade, Capital Cost $17.4M
- North Fork Junction Renewal Project, Capital Cost $1M
- Sydney Central Yard Upgrade, Capital Cost $22M
- Electrical Works Wynyard Stage 2, Capital Cost $3.5M

